Power China Toksun 100MW
|
Plant |
Power China Toksun 100MW |
|
Location |
Toksun |
|
Capacity (MW) |
100MW |
|
Construction Start Date |
2023 |
|
Construction End Date |
Under Construction |
|
Generation Start Year |
Plan 2025 |
|
Heliostat Aperture Area (m²) |
30 |
|
Heliostat Manufacturer |
Cosin Solar |
|
Heliostat Model |
Cosin Solar |
|
Solar Field Area (m²) |
440400 |
|
Receiver Fluid |
Molten Salt |
|
Receiever Manufacturer |
Cosin Solar |
|
Receiver Model |
Cosin Solar |
|
Number of Heliostats |
14680 |
|
Tower Position (Lat/Long) |
42.749822,88.060567 |
General Plant Data
· Location: Toksun Turpan Xinjiang (XUAR) China
· Capacity (MW): 100MW
Plant Timeline
· Construction Start Date: 2023
· Construction End Date: Under Construction
· Generation Start Year: Plan 2025
Plant Costs
Heliostat Design
· Heliostat Aperture Area (m²): 30
· Heliostat Manufacturer: Cosin Solar
· Heliostat Model: Cosin Solar
· Solar Field Area (m²): 440400
Tower/Receiver
· Receiver Fluid: Molten Salt
· Receiever Manufacturer: Cosin Solar
· Receiver Model: Cosin Solar
Plant Layout
· Number of Heliostats: 14680
· Tower Position (Lat/Long): 42.749822,88.060567